2nd floor Administration space
| Space | Area in m² | State of occupancy |
| Administration 1 | 80,28 | |
| Administration 2 | 85,33 | |
| Administration 3 | 86,95 | |
| Administration 4 | 24,78 | |
| Administration 5 | 24,73 | |
| Administration 6 | 25,24 | |
| Administration 7 | 88,46 | |
| Administration 8 | 54,99 | |
Administrations - List of standard equipment:
- Tile flooring / floating laminate flooring
- inner door
- preparation for the security system
- wash basin
- sink
- toilet
- preparation for a kitchenette
- ceiling mounted lights
- decorative lightning of windows
- UPC distribution (settled in a separate contract)
- Internet and telephone distribution (direct interconnection of buildings with an optic cable to the operator, settled in a separate contract)
- home phone for controlling the entrance door and communication with the reception desk